CASE STUDIES

WE GENERATE REAL SOLUTIONS

FOR REAL PROJECTS

We have created some case studies to illustrate our level of experience in the delivery of real projects.

 

Media City, Manchester

MediaCityUK, Manchester

Involving one of the UK's largest ever infrastrucutre projects in an already congested part of Manchester. MediaCityUK had 'challenge' written all over it.But that didn't stop Energetics delivering on time and within budget.

PDF View Case Study
File Size : 718kb

 

 

The Rock, Bury

Saxton, Leeds

Proving that style and substance needn't be mutually exclusive, Energetics flexible approach to design and build ensured that the electrical infrastrucutre for Urban Splash's development at Saxton, Leeds was as aesthetically pleasing as it was robust.

PDF View Case Study
File Size : 486kb

 

 

The Rock, Bury

The Rock, Bury

Take one forward thinking redevelopment of a rundown area of Bury Town, add Energetics' Connected Thinking and the result is an ingenious electrical infrastrucutre that saved on time, space and money.

PDF View Case Study
File Size : 463kb

 

 

The Rock, Bury

Regenerating North Solihull, Solihull

When Bellway Homes, one of the Regenrating North Solihull partners, embarked on 100 new homes as part of the £1.8billion project, they were looking for a utility provider with proven experience of the issues associated with the redevelopment sites - and Energetics didn't disappoint.

PDF View Case Study
File Size : 517kb

 

 

Edge Lane, Liverpool

Liverpool Innovation Park, Liverpool

When Liverpool Vision embarked on the regeneration of the Edge Lane gateway route into Liverpool, they had in mind a hub of innovative activity. So it's perhaps only fitting that the electrical infrastrucutre we proposed included our first-ever primary substation.

PDF View Case Study
File Size : 542kb

 

 

Mossgate, Heysham

Mossgate, Heysham

Delivering on schedule is the lifeblood of any developer so when Miller Homes and Persimmon Homes entered into a five-acre development of 393 new-build properties in Heysham they looked to one name to ensure the critical phase of utility infrastrucutre was delivered on time - Energetics.

PDF View Case Study
File Size : 614kb